New Learning Precinct and Administration Building Works Are Underway!
After two years in the planning, Cromwell has commenced renovations to the Administration Building and a new College Learning Precinct.

The refurbishment and extension of the tutorial rooms will create purpose-built learning and study spaces for residents. The new tutorial precinct integrates with the North lawn and overlooks the main courtyard and will enable the College to double its tutorial capacity and create a learning precinct consisting of:
- 3 spaces for small group tutorials;
- a dedicated space for our engineering, architectural, and fashion students to spread out plans, patterns, and to build models;
- 3 spaces for large group tutorials which can be reconfigured for quiet study or conference groups
Walkway Main Courtyard New Learning Precinct Tutorial Room Elevation Lower Level (Tutorial) Floor Plan Upper Level (Tutorial) Floor Plan
The refurbishment of the Administration Building will bring all the Cromwell staff under one roof and centrally locate student services, with the lower level creating a student hub that will integrate pastoral and academic support, with access to the Deputy Principal, Dean of Students, and College Counsellor. The Administration Building renovations will also improve access for those residents and visitors with a disability.
The project is expected to be completed by the start of the academic year in February 2022, and it is our aim to keep student disruption to a minimum.
Project Architect: Jeremy Salmon Architects
Project Manager: Hammond Neale
Builder: Bedford Built